TSB

Keypoint Office

Contract Value: 6M

Role: Sub Consultant, Designer

Sector: Retail

HGA were employed by a MEP installation Contractor for this design and build refurbishment project in Aztec West near Bristol on behalf of Wates & TSB.

HGA undertook the mechanical and electrical services design on behalf of the Contractor.

Keypoint is a three story office block with an occupancy of 2025.

As an existing building, we determined the condition of the existing services and where possible retained and modified the existing infrastructure to suit the revised layout.

Click the images below to enlarge

Other Projects...
  • Clevedon Pier

    Sector: Community

    HGA worked as part of the clients design team with O’Leary Goss on the prestigious refurbishment of the gate house ...
  • Richard Huish College

    Sector: Sport & Leisure

    HGA worked as part of the clients design team with Grainge Architects for the construction of a new sports centre ...
  • Marlborough College

    Sector: Education

    HGA worked as part of the Clients design team with Kendall Kingscott Architects to refurbish a 64 bed board house ...
Houghton Greenlees & Associates © 2024. All Rights Reserved | Registered in Cardiff. Registered No. 1813711 | VAT Reg No. 416 7868 18 | Privacy Policy | Email Disclaimer | Website Design Dorset - Good Design Works