Marlborough College

Turner House

Contract Value: £3.2M

Role: Sub Consultant, Designer

Sector: Education

HGA worked as part of the Clients design team with Kendall Kingscott Architects to refurbish a 64 bed board house at Marlborough College.

HGA provided designs for the mechanical and electrical services throughout the boarding house. The project was completed over two summer holiday periods.

Key engineering challenges with the refurbishment project were the interfacing between phases due to the aged and poor condition of the existing services. Maintaining supplies to the out of scope areas with systems such as automatic fire detection and domestic services required an adaptive approach on site once the location and routing of the existing services could be determined.

Click the images below to enlarge

Other Projects...
  • VICTORIA CHURCH

    Sector: Community & Religion

    HGA worked as part of the clients design team with Stride Treglown to refurbish The Sanctuary & Narthex at Victoria ...
  • TSB

    Sector: Office

    HGA were employed by a MEP installation Contractor for this design and build refurbishment project in Aztec West near Bristol ...
  • Clevedon Pier

    Sector: Community & Religion

    HGA worked as part of the clients design team with O’Leary Goss on the prestigious refurbishment of the gate house ...